The intervention involved the replacement of approximately 32 linear meters of the main collector and 14 meters of drainpipe, in addition to renewing seven domestic connections and installing two inspection wells. The works had a budget of 41,558.70 euros.
During the construction, a provisional wastewater pumping system was implemented to ensure the continuous operation of the network. Measures were also taken to facilitate access to properties and pedestrian and vehicle traffic through temporary shelters and metal plates.
New sanitation pipes made of double-walled PVC, with a corrugated exterior and smooth interior, or polypropylene, were installed according to the project's technical specifications. After the network renewal, the affected area was concreted and the pavement was restored.