Port of Santa Cruz de Tenerife Conducts First LNG Supply Operation with Tanker Trucks

The Baleària ferry Mercedes Pinto was the first vessel to receive liquefied natural gas via the Multi Truck to Ship (MTTS) method at the Dársena de Anaga.

Image of a ship receiving LNG supply at the port of Santa Cruz de Tenerife.
IA

Image of a ship receiving LNG supply at the port of Santa Cruz de Tenerife.

The Port of Santa Cruz de Tenerife has carried out its first liquefied natural gas (LNG) supply operation to a vessel using tanker trucks, specifically the Mercedes Pinto ferry operated by Baleària, employing the Multi Truck to Ship (MTTS) method.

The operation, which took place at the dock of the Dársena de Anaga, began around 12:30 PM and was performed by ESK, S.A. A total of 600 MWh of LNG was supplied using two tanker trucks, achieving a pumping rate of 700 liters per minute.
This new Truck to Ship (TTS) and Multi Truck to Ship (MTTS) modality complements the port's prior experience with Ship to Ship (STS) supply, broadening the fuel bunkering options for vessels and adapting to various operational needs.
The implementation of this alternative supply method responds to Baleària's requirement for its eco-efficient vessels and reinforces the port's commitment to sustainability, innovation, and energy transition in maritime transport.
The successful launch was the result of coordinated efforts between the Port Authority of Santa Cruz de Tenerife, Baleària, ESK, and other involved agents, who defined and validated safe and efficient procedures, including risk analysis and emergency protocols.
The ferry Mercedes Pinto, measuring 123 meters in length and capable of carrying 1,200 passengers and 425 vehicles, reaches speeds of 35 knots and is Baleària's twelfth vessel equipped with dual-fuel engines designed to run on natural gas and biogas, a CO₂-neutral fuel.
Based on information from the official source: Autoridad Portuaria de Santa Cruz de Tenerife (Puertos de Tenerife) (10/09/2026)